SERVICES WE PROVIDE

ABSOLUTE use trailer mounted jetters that pump 12 GPM @ 4,000 psi - for the toughest of jobs in pipes from 3” (75mm) diameter, up to 1,000 diameter plus.

A SELECTION of jetting heads allow fast and efficient operation on blockages, deposits or pre-survey cleaning.

LANCING Thorough lancing of manholes including walls, steps and benchings.

ABSOLUTE use a Pearpoint mainline tractor / camera unit which operates in pipes from 6” (150mm) to 60” (1,500mm) dia. Additional lighting and
a high resolution camera offers superb quality video footage. A second camera / video system is used for smaller diameter pipes, allowing
surveys to be carried out in pipe sizes as small as 3” (75mm) diameter.

REPORTS A comprehensive report and high quality video is at the heart of our survey operation. A separate sheet for every run, with on screen and typed meterage for accurate location of faults.

GULLEY CLEANING Debris in gullies & laterals will often find itself in the pipe, simply by the action of the jetting head. From that superbly clean job, we recommend gulley cleaning (including lancing out the laterals) prior to mainline jetting and surveying.

DEBRIS REMOVAL At every manhole. We do not ‘chase down’ debris as this causes problems further along, or at a later date.

LANCING OF SURFACES AND BUILDINGS Roads, pathways, pits, contaminated area’s and buildings. Tank and silo lancing are also tasks within our remit as operators are certificated to CONFINED SPACES work.

Photograph Gallery (Please click on the squares to view photographs)
1 2 3 4 5 6 7 8
ABSOLUTE DRAINAGE SERVICES LTD    1 High Street Stanwick    Northants    NN9 6QA    England
JRDesignStudio.com © 2009 all rights reserved